INDOT Shares Recommendations on ProPEL US 30 and US 31 Studies

The Indiana Department of Transportation (INDOT) continues its efforts to assess innovative ways to address corridor needs along the US 30 and US 31 corridors in northern Indiana.

The ProPEL US 30 and US 31 study teams released the latest draft reports for community feedback. The Draft Level 2 Screening Reports for US 30 and US 31 include a robust analysis of 86 intersections over the 180-mile study area across 12 counties. An interactive map including each location is also available here.

The Level 2 screening evaluates location-specific improvements for constructability, fiscal responsibility and potential impacts. The improvements considered in this step were identified from the Universe of Alternatives (Level 1) screening results. The screening process included consideration of location-specific safety and operational data, public input, traffic analysis, potential impacts and a conceptual footprint comparison.