ELKHART COUNTY, Ind. – The Indiana Department of Transportation announces temporary traffic restrictions on U.S. 20 for the removal of overhead signs.

On Wednesday, June 24, crews will remove the overhead signs and structure on eastbound U.S. 20 near the interchange with State Road 19.
Crews will begin with alternating lane restrictions starting around 5 p.m. in all lanes of eastbound U.S. 20 as well as the passing lane of westbound U.S. 20.
From approximately 8 p.m. to 9:30 p.m., crews will complete two rolling slowdowns in the eastbound lanes to finish removing the overhead structure. Each rolling slowdown will last for approximately 10 minutes with the minimum of a 20 minute break between each slowdown.
Drivers are asked to use extra caution in the area while crews are working and to obey all posted signs and directions that are being given by those guiding traffic.
Temporary directional signs will be put into place until the overhead structure can be replaced.
INDOT encourages drivers to consider safety for all by slowing down, using extra caution and driving distraction-free when travelling in and around all work zones. All work is weather-dependent and schedules are subject to change.























